FACILITIES
Located on the NW Re-claim area at the Geraldton
Fishermen’s Wharf, Geraldton Boat Lifters Ltd has
the following:
• New (2007) 200 Tonne travel lift with 10.2m
Beam capacity.
• Dedicated docking bay for GBL vessels.
• Over 1.2 hectares of hard stand area on which your
vessel can be located.
• Separate wash-down, sand blast and paint
shed facilities.
• Fully enclosed paint shed to ensure that the work
completed by contractors on your vessel will remain
high class.
• Security fencing around the facility.
• Perimeter security system which will only allow
permitted contractors and staff access.
• Ability to remove your vessel and allow you to refit
it throughout the year. |
|